PC

Project Command Center

User Guide — version 1.0

A complete project workspace that lives in a single HTML file. No server, no account, no installation, and no internet connection — ever. Everything you create stays on this computer until you choose to export it.

What it is
One file, roughly 350 KB. Double-click it and the whole application opens in Chrome or Edge.
Where data lives
In your browser's private storage on this PC. Nothing is uploaded, because there is nothing to upload to.
How to keep it safe
Export a .pcc or Excel backup regularly. The app reminds you after seven days.
πŸ“˜
How to read this guide Every picture below is the real interface, drawn with the application's own stylesheet. Numbered red markers point to the control being described, and the matching numbered list sits directly beneath.

1Getting started

  1. Save the file somewhere permanent. Your Documents folder or a synced OneDrive folder both work. Avoid running it from a temporary Downloads location you might clear out — if the file moves, your saved projects still load, but keeping it in one place avoids confusion.
  2. Double-click Project_Command_Center.html. It opens in your default browser. If that is not Chrome or Edge, right-click the file and choose Open with.
  3. Look around the sample project. A worked example called Sample — Fleet EAM Rollout is loaded on first run, with tasks, dependencies, milestones, risks and a team, so nothing is empty while you learn.
  4. Check your storage mode. Press ? and open the About tab. See the note below — this takes ten seconds and tells you how much room you have.
  5. Remove the sample when ready. The dashboard has a Remove sample project button. Your own work is untouched.
  6. Export a backup. Press Ctrl+S and save a .pcc file. Do this now so the habit is formed.

Checking your storage mode

The application saves to whichever storage the browser allows, and it tells you which one it picked. Press ? → About:

file:///C:/Users/you/Documents/Project_Command_Center.html
Help → About reports exactly which storage the app is using, so you are never guessing.
If it saysWhat that means for you
IndexedDBFull room — hundreds of megabytes. Attachments up to 12 MB each. Everything in this guide works, including linking a file on disk for refresh.
localStorage
(limited)
Normal when a page is opened straight from disk, because browsers restrict the larger store for file:// pages. Your projects still save and reload automatically, but the total budget is about 5 MB, attachments are capped at 700 KB each, and the linked-file button is unavailable. Export backups more often.
noneThe browser is blocking all storage, usually private/incognito mode or a locked-down policy. Nothing will be saved. Export before closing the tab, and reopen in a normal window.
πŸ’‘
Want the roomier mode? Put the file on a small local web server, or open it from a synced location your organisation serves over http. That is optional — limited mode is perfectly usable for typical projects of a few hundred tasks without large attachments.

2The screen, one piece at a time

Every view shares the same frame: a top bar for global actions, a left rail for navigation and filters, and the working area in the middle.

Project Command Center
1
2
3
4
5
6
7
8
PC
Project Command CenterOffline workspace
βŒ•
Saved just now
β†Άβ†· βŒ˜β—? + Task

Sample β€” Fleet EAM Rollout

Sample
Project settings
Completion
12%
1 of 11 tasks done
Open tasks
10
0 unassigned
Overdue
2
3 due within 7 days
Open risks
4
Top: Asset data quality

Progress by column

Backlog
7 Β· 64%
In Progress
2 Β· 18%
Complete
1 Β· 9%
The standard layout. Numbers are explained below.
  • 1
    View rail. Nine ways to look at the same data. Each has a number key shortcut, including 9 for the Issues log.
  • 2
    Project switcher. Jump between projects. Ctrl+P focuses it.
  • 3
    Global search. Filters titles, notes, owners, tags and checklist text as you type. / jumps here.
  • 4
    Save indicator. Shows Saved plus how long ago. Turns amber while writing, red if storage fails. Once you choose an auto-backup folder, a second backup pill appears next to it (see section 16).
  • 5
    Undo / redo, command palette, theme, help. Sixty levels of undo are kept.
  • 6
    Filters. Owner, priority, tag and a flag filter for things like overdue or critical path.
  • 7
    Data actions. Export, import, linked file, recovery snapshots, Auto-backup…, and clear.
  • 8
    Working area. Changes with the selected view.
πŸ”Ž
If tasks seem to be missing, a filter is probably still on. Whenever anything is filtered, a blue bar appears at the top of the view naming every active filter with a Clear filters button, so it can never hide your work silently.

3Dashboard β€” press 1

The status answer in one screen: how far along, what is late, what is coming, who is loaded up, and what could go wrong.

The eight headline numbers

Completion
42%
8 of 19 tasks done
Open tasks
11
2 unassigned
Overdue
3
4 due within 7 days
Milestones
1 / 4
Next: Sep 26
Open risks
4
Top: Asset data quality
Open issues
5
1 critical
Schedule slip
+4 d
3 late vs baseline Β· worst +9 d
Budget
$84,500
of $78,000 Β· 108%
Last status report:Executive, 2 days agoTeam, 9 days agoSend one
Coloured left edges: blue is neutral, green is healthy, amber wants attention, red is a problem. The line under the tiles is the status-report reminder, described below.
TileHow it is calculated
CompletionProgress weighted by each task's estimated hours, so a 40-hour task counts more than a 2-hour one. With no estimates entered it falls back to a plain average of progress.
Open tasksEverything not sitting in a column marked as the completion column.
OverdueDue date earlier than today and not complete.
MilestonesAchieved versus total, plus the next date due. Turns red if that date has already passed.
Open risksAnything not closed, with the highest probability×impact named underneath.
Open issuesIssues from the Issues log that are not yet Resolved or Closed. The line underneath says how many are critical, and the tile turns red if there is at least one.
Schedule slipHow far due dates have moved since you saved a baseline on the Timeline. It shows a dash and No baseline set until a baseline exists; after that it reads the average slip, such as +4 d, with N late vs baseline and the worst task underneath.
BudgetSum of task costs against the sum of task budgets. Red when spend exceeds budget.

Status-report reminder and button

Directly under the tiles, a small line shows Last status report: followed by one chip per audience — for example Executive, 2 days ago. The Team chip turns amber once it is more than seven days old. If you have never sent one the line reads No status reports sent yet. Either way, Send one opens the send dialog described in section 11.

The same dialog is behind the βœ‰ Status report button in the dashboard header, next to Project settings.

Panels underneath

Overdue βœ‰ Follow up
3

Load asset master from Fixed Assets
Asset Manager Β· In Progress
Aug 2
Criticality ranking workshop
Reliability Engineer Β· Scheduled
Aug 9
Overdue work, oldest first, with a one-click follow-up email.

Workload

AMAsset Manager
3t Β· 210h
MPMaint. Planner
2t Β· 240h3/8 wk
REReliability Eng.
4t Β· 136h
Open hours per person. A red bar means the person is over their weekly capacity. A red 3/8 wk chip means they are over capacity in 3 of the next 8 weeks (hover it for the full wording). Stakeholders never appear here.

The remaining panels are Coming up (next dated work), Milestones (tick them off inline, drag to reorder), Risk heat map, Dependency warnings, and Recent activity β€” a running log of every change you have made.

4Board β€” press 2

A Kanban board where columns are your workflow stages. Drag cards between them to change status.

1
2
3
4
5
Backlog7β‹―
Load asset master from Fixed Assets
Critical⚠ Aug 2AMβ˜‘ 1/4
Build PM task library
HighSep 12MP⇄ 1pm
Storeroom BOM & min/max setup
MediumSep 20πŸ”
In Progress6/5β‹―
Criticality ranking workshop
High
Telematics integration
HighOct 6πŸ“Ž 2
Complete1β‹―
Criticality ranking workshop
HighAug 27
Asset hierarchy & naming standard
Critical
A card mid-drag. The source fades, the destination column glows, and the card tilts under the pointer.
  • 1
    Column count. Plain grey normally.
  • 2
    WIP limit exceeded. Shows 6/5 in red when a column is over its work-in-progress limit. Set limits in Project settings.
  • 3
    Overdue card. Red left edge and a red date chip.
  • 4
    Due soon. Amber left edge, within seven days.
  • 5
    Drop target. The column you are hovering over is outlined in blue.

Reading a card at a glance

MarkingMeaning
Red left edgeOverdue.
Amber left edgeDue within seven days.
Pink outlineOn the critical path β€” slipping this task moves the project finish date.
StrikethroughTask sits in a completion column.
β˜‘ 1/4Checklist progress.
πŸ“Ž 2Two files attached.
⇄ 1Depends on one other task.
πŸ”Recurring β€” regenerates when completed.
πŸ’‘
Move several cards at once. Ctrl-click (or ⌘-click) each card to select it, then drag any one of them. All selected cards land in the destination column together.

5Tasks table β€” press 3

The fastest way to edit many tasks. Every cell is live β€” type straight into it and the change saves itself.

1
2
3
4

Tasks

19 shown
3 selectedBulk editβ€¦βœ‰ EmailDeleteClear β­³ CSVβ­³ ExcelοΌ‹ Task
TaskStatus β–²PriorityOwnerDueSlipProgressEst h
β ΏLoad asset master from Fixed AssetsIn ProgressCriticalAsset Manager2026-08-02+4d
55%
60
β ΏCriticality ranking workshopScheduledHighReliability Eng.2026-08-27−2d
0%
16
β ΏBuild PM task library ⇄1BacklogHighMaint. Planner2026-09-12
0%
80
β ΏTelematics integration πŸ”In ProgressHighAsset Manager2026-10-06
30%
90
Inline editing with three rows selected for a bulk action.
  • 1
    Drag handle. Grab β Ώ to reorder tasks. Rows only drag by this handle, so you can select text freely.
  • 2
    Row selection. Tick rows to unlock the bulk actions.
  • 3
    Sortable headers. Click to sort, click again to reverse. Sorting applies to the whole task list, not just the visible page.
  • 4
    Bulk actions. Edit, email, or delete every selected task at once.

The Slip column

Next to Due is a Slip column. It shows how many days the due date has moved since you saved a baseline on the Timeline: a red +4d means the task is now due later than planned, and a green −2d means earlier. It stays blank until a baseline exists, and for any task added after it. Click the header to sort by it, like any other column.

Bulk edit

With rows selected, Bulk edit… opens a form where every field is optional. Leave a field blank and it stays as it is; fill one in and it is applied to all selected tasks. Tags are added rather than replaced, so you will not lose existing labels. Everything is a single undo step.

⚑
Large projects. Above 250 matching tasks the table renders the first 250 and says so, with Show more and Show all buttons. This keeps typing responsive β€” a full 1,200-row render takes about a second and a half, versus twenty milliseconds when capped. Nothing is hidden silently; the banner always states the true total.

6Calendar β€” press 4

A month grid showing tasks on their due date and milestones as diamonds.

Calendar

β€ΉTodayβ€Ί
September 2026
Double-click a day to add a task
Sun
Mon
Tue
Wed
Thu
Fri
Sat
30
31
1
Load asset master
2
3
Criticality workshop
4
5
6
7
Naming standard
8
9
10
Storeroom BOM
PM frequencies
11
12
β—† PM program live
Blue is scheduled, green is complete, red is overdue, purple diamonds are milestones. The current day is outlined.
  • Add a task on a date β€” double-click any day and the new-task form opens with that due date filled in.
  • Open something β€” click any entry.
  • Filters apply here too, so you can view one person's month by setting the Owner filter.
  • Days with more than six tasks show a +n more line; switch to the table or timeline for the full picture.

7Timeline & Gantt β€” press 5

Bars positioned by start and due date, with dependency arrows and the critical path highlighted. Only tasks that have at least one date appear here.

1
2
3
4
5

Timeline

7 tasks Β· critical path 74 days
Baseline set Aug 12πŸ“Œ Re-baseline
DayWeekMonthToday
Task
Aug
Β·
Β·
Sep
Β·
Β·
Oct
Β·
Β·
Nov
Asset hierarchyAM
Asset hierarchy
Load asset masterAM
Load asset master
Build PM libraryMP
Build PM task library
TelematicsAM
Telematics integration
β—†PM program live
Backlog Scheduled In Progress Complete ⚠ Overdue (red outline) Critical path (outlined) Milestone Baseline (thin bar)
Week zoom. The vertical red line is today. The thin grey bars under two of the tasks are their baselined dates.
  • 1
    Zoom. Day, Week or Month changes how many pixels each day occupies. Today scrolls the current date into view. On a wide screen the calendar carries on to the right edge of the panel at the same scale, so a short project never leaves the chart half empty. Task column width: drag the right edge of the Task header (the cursor turns to ↔) to show more or less of each name; the width is remembered in this browser, and double-clicking the edge resets it.
  • 2
    Bar colour = status. Each bar is filled with the colour of its board column β€” by default Backlog grey, Ready/Scheduled blue, In Progress amber, Blocked/Waiting orange, Review/Verification purple, Done/Complete green. Change a column's colour with the colour swatch in Project settings β†’ Columns; the board headers use the same colours, and the legend under the chart lists your columns. The lighter shading inside a bar is progress so far.
  • 3
    Overdue bar keeps its status colour but gets a red outline and a ⚠ before the title, so you can still see where it is stuck.
  • 4
    Critical-path bar outlined in pink.
  • 5
    Milestone diamond β€” purple when planned, green once achieved.

Setting a baseline

A baseline is a saved copy of the plan, so you can see later how far things have drifted. Click πŸ“Œ Set baseline in the Timeline header and every task's current start and due dates are stored as the plan. Nothing else changes.

  • Ghost bars. Each task then shows a thin grey bar under its normal bar — the baselined dates. The gap between the two is the slip. The legend at the bottom calls it Baseline (thin bar).
  • Where else it shows. A red or green Slip column in the Tasks table, the Schedule slip tile on the Dashboard, and the schedule line in every status report.
  • Re-baseline. Once a baseline exists the button reads Re-baseline and a chip beside it says Baseline set with the date. Clicking it asks you to confirm Replace baseline…?, because slip is then measured from the current dates instead. Ctrl+Z undoes it.
  • Tasks added afterwards have no baseline until you re-baseline, so they show no ghost bar and no slip.

Dependencies and the critical path

Grey arrows connect a predecessor to its successor. An arrow turns red when the successor starts on or before the predecessor finishes β€” a scheduling conflict. The same warnings are collected on the dashboard and can be isolated with the Dependency conflict flag filter.

The critical path is the longest chain of linked work through the project. Every task on it is outlined in pink on both the board and the timeline. If one slips a day, the whole project finishes a day later β€” so these are the tasks to protect.

πŸ“
How dates behave. A task with only a due date is drawn as a single-day bar on that date. A task with neither date does not appear on the timeline at all β€” it will still be on the board and in the table.

8Analytics β€” press 6

Charts drawn from the same data, useful for a weekly review. Four headline numbers sit at the top: Forecast finish (when the work will be done at the recent pace, and how that compares with the target end date), Weekly pace (tasks finished per week over the last four weeks), Avg slip (days against the baseline, open tasks only) and Avg time to resolve issues.

ChartWhat it shows
Burn-up & forecastTasks completed over time against the total scope (which rises as tasks are added), with a dashed forecast line from today at the recent weekly pace. A sentence above it reads, for example, β€œAt the current pace (0.8/week): done Dec 15, 35 days after the target end date.” Today and the target end are marked.
Weekly throughputTasks finished (blue) and created (orange) per week for the last 12 weeks β€” are you keeping up?
Time in statusAverage days a task spends in each column, in your column colours β€” the longest bar is where work gets stuck. Built from task history, which started on Sep 30, 2026, so it fills in as tasks move.
Schedule slipDays each task is later (red, right) or earlier (blue, left) than its baseline, worst first, plus the average slip over time. Needs a baseline (Timeline β†’ πŸ“Œ Set baseline).
Issues by systemOpen issues per system, split by severity (Critical, High, Medium, Low).
Issues opened vs resolvedIssues logged and resolved per week for 12 weeks, with the average time to resolve.
Overdue agingOverdue tasks per owner, grouped 1–7, 8–14, 15–30 and 30+ days late (darker = later).
Progress by tagShare of each tag's tasks that are done, least-done first.
MilestonesEvery milestone on one line: βœ“ Achieved, βœ— Late, ⚠ At risk (an open task due before it is overdue or slipping) or ● On track.
Status mixDoughnut of tasks per column with the overall percentage in the middle.
Cost vs budgetTwo bars per column β€” grey for budget, green for actual, red where actual exceeds budget.
Capacity — next 8 weeksOne row per person, one column per week starting Monday. Each cell is the estimated hours booked that week, coloured against the person's weekly capacity. See below.
Throughput by ownerOpen tasks and hours per person.
Key numbersThe figures behind everything else, including critical-path length and budget variance.
  • Hover any bar, segment or line for the exact numbers; the burn-up shows a crosshair with the date, completed, scope and forecast.
  • Click a bar or segment to list the tasks (or issues) behind it, then click one to open it.
  • Table in each chart's header switches it to the plain numbers (and Chart switches back) β€” handy for copying into an email or reading without colour.
  • Filters. The sidebar filters apply to the task charts. Issue charts and the milestone strip always cover the whole project, and say so.

Capacity — next 8 weeks

This panel replaces the old workload heat map. It answers one question: who is going to be overloaded, and when?

Capacity β€” next 8 weeks

Sep 28
Oct 5
Oct 12
Oct 19
Oct 26
Nov 2
Nov 9
Nov 16
Asset Manager 25h
31
28
22
14
8
Maint. Planner 35h
20
30
33
18
12
6
under 80% 80–100% over capacity
Unscheduled (no dates): Reliability Eng. 12h
Each row shows the person's weekly capacity beside their name. Click any cell to see the tasks behind it.
  • How hours are placed. Each open task's estimated hours are spread evenly over the working days (Monday to Friday) between its start and due dates, then split between its owners. A task with only a due date lands on that day; one with only a start date lands on that day.
  • Colours. Green is under 80% of the person's capacity, amber is 80–100%, red is over.
  • Click a cell to list the tasks behind it with their hours for that week. Click a task in the list to open it.
  • Unscheduled work. Estimated hours on tasks with no dates cannot be placed in a week, so a line under the grid lists them per person: Unscheduled (no dates): Name 12h.
  • Who is included. Stakeholders (see section 14) are left out. The default capacity is 30 hours a week until you set a different one.
  • What is not in the grid. Work that was due before this week is not in the grid.
πŸ’‘
The grid only has something to show once tasks carry an owner, dates and an hours estimate. Set each person's weekly capacity in Project settings → Team so the colours mean something. The same calculation drives the red N/8 wk chip on the dashboard workload panel.

9Risks β€” press 7

A standard register plus a 5×5 probability-by-impact heat map.

Heat map

5
1
4
1
3
1
2
1
1
1
2
3
4
5
Rows = probability Β· Columns = impact

Register

RiskPIScoreOwnerStatus
Asset data quality from source system4520Asset ManagerMitigating
Telematics credentials delayed3412Asset ManagerOpen
Technician adoption of mobile app339Maint. PlannerWatch
Storeroom understocked at go-live248Storeroom LeadOpen
Score is probability × impact. 15 and above is red, 9–14 amber, 5–8 blue, below 5 green.

Closed risks drop off the heat map but stay in the register for the audit trail. The dashboard tile counts open risks only.

10Issues log β€” press 9

A standalone log for things that are broken — bugs and problems in the systems you work with, such as Oracle eAM, Motive or Power BI. It is separate from Risks: a risk is something that might go wrong, an issue is something that already has.

Issues

6 logged Β· 4 open
οΌ‹ Issue
Open issues
4
Oldest open 21 d
Critical
1
open
High
2
open
Medium
1
open
Low
0
open

Issue log

IssueSeveritySystemStatusAssignedLoggedDays openTicket
Work orders will not release
Release button errors out for Oracle…
CriticalOracle eAMIn Progress
πŸ”§ Fix: Work orders will not release Β· In Progress
Dana RuizSep 264SR 3-88123βœŽβœ•
Trailer positions stop updatingHighMotiveWaiting on VendorSam ItoSep 228MOT-4471βœŽβœ•
Dashboard shows stale dataMediumPower BIOpenβ€”Sep 921β€”βœŽβœ•
Login loop on mobileHighOracle eAMResolved
Sep 26
Dana RuizSep 1511SR 3-87002βœŽβœ•
The Issues page with the Open filter off so a resolved row shows (dimmed, at the bottom). The πŸ”§ line under a status is the linked fix task.

Logging an issue

Press 9 and click οΌ‹ Issue, or use Ctrl+K → New issue from anywhere. The form has these fields:

FieldWhat to put there
IssueA short title — what is broken.
StatusOpen → In Progress → Waiting on Vendor → Resolved → Closed.
SeverityCritical, High, Medium or Low.
System / areaWhere it happens. Systems you have used before are suggested as you type, so the names stay consistent.
Reported by / Assigned toWho raised it and who is working it. Team names are suggested.
Ticket #Your Oracle SR number or the vendor's reference.
Logged / ResolvedThe two dates. Resolved fills itself in when you set the status to Resolved or Closed, and is cleared again if you reopen the issue.
Steps / detailsWhat happened, how to reproduce it, any error messages.
ResolutionWhat fixed it — worth filling in for the next time.

Reading the page

  • The strip at the top shows Open issues with Oldest open N d underneath, then one tile per severity counting open issues only.
  • Filters. The first dropdown switches between Open, Resolved / closed and All. The second narrows the list to one system.
  • Order. Open issues come first, then by severity, then oldest first — so the most urgent, longest-waiting problem is always at the top.
  • Columns. Issue (with a preview of its details), Severity, System, Status (with the resolved date), Assigned, Logged, Days open, Ticket, and ✎ to edit or βœ• to delete. Resolved rows are dimmed.

Making a fix task

When the work to fix an issue needs tracking on the board, open the issue and click πŸ”§ Create task. It is offered only while the issue has no fix task. The app saves the issue, then creates a task in the first board column and opens it for you:

Task fieldFilled in with
TitleFix: followed by the issue title.
PriorityThe issue's severity.
OwnerThe person the issue is assigned to.
NotesThe issue's details, plus a Ticket: … line.
Tagissue
An issue whose fix task has reached a done column while the issue is still open. The banner offers one click to resolve it.

The two records stay linked, and you can move between them:

  • In the issue dialog, a banner reads πŸ”§ Fix task: <title> Β· <column>. Click the title to open the task. When the task is done but the issue is not, the banner also offers Fix task done — mark resolved.
  • In the Issues table, the Status cell shows πŸ”§ <task title> Β· <column> (click it to open the task) and adds fix done once the task is complete.
  • In the task dialog, a banner reads 🐞 From issue: <title> Β· <status>. Click the title to open the issue.
πŸ”—
Deleting breaks the link cleanly. Delete either the issue or its fix task and the other one simply loses the link — nothing dangles. Duplicating a project re-links the copies.

Where issues show up

  • The Open issues tile on the Dashboard.
  • The status reports, which quote critical and high issues with their age and ticket number, and feed the suggested health colour.
  • The Issues sheet in the Excel workbook, so the log can be edited in a spreadsheet and merged back.

11Status reports β€” press 8

A print-ready status report on white paper, written for one of three audiences, plus a dialog that turns it into an email. Use it for the weekly note to your team, the monthly update to management, and the short one for executives — all from the same live data.

Status report

ExecutiveManagementTeam
βœ‰ Send status reportπŸ–¨ Print / Save as PDF

Executive summary auto-drafted from the project Β· Executive report
↻ Regenerate

Sample β€” Fleet EAM Rollout β€” Executive status
Period Sep 23 – Sep 30 Β· EAM-01
AMBER
1 critical issue(s) open; tasks are slipping 4 days on average vs baseline
Decisions needed
Approve a 2-week extension for the asset master load.
The Report page on the Executive tab: tabs, the editor panel (not printed), then the report itself.

Choosing an audience

The Executive, Management and Team tabs across the top change how much detail the report carries (see the table below). The report always covers the whole project and ignores the sidebar filters — if a filter is on, a banner says so and offers Clear filters, so a circulated document can never quietly leave work out.

The editor panel

Above the report sits a panel that is not printed. It lets you add your own words without touching the numbers:

  • Executive summary. A short paragraph. The label beside the heading tells you where the wording came from: auto-drafted from the project, or your wording once you have typed in it. Clear the box completely and the summary is left out of the report.
  • ↻ Regenerate. Throws away your wording and goes back to the automatic draft. Anything in Decisions needed is kept.
  • Decisions needed. What you need leadership to decide or approve. If you fill it in, it appears in the report as an amber-highlighted block.

Your wording is saved separately for each audience, together with the project. Once you send a report for an audience (see below), that audience's wording is cleared so next week starts from a fresh draft — the log keeps exactly what was sent.

What the automatic summary says

The draft is written from the data in plain sentences. It covers, in order:

  • the percentage complete, and the health in words — on track, at risk or off track;
  • tasks completed this period, tasks due next period, and how many are overdue;
  • the schedule against the baseline, naming the worst-slipping task (only once a baseline has been set);
  • the next milestone, and how many are late;
  • watch items: the critical and high issues, led by the top one with its age and ticket number, and the top open risk;
  • the percentage of budget used.

What the report contains

Every report starts with a header: <Project> — <Level> status, the period, a coloured health block (Green, Amber or Red) with the reasons beside it, the Executive summary, and Decisions needed if you wrote any. The sections that follow depend on the audience:

SectionExecutiveManagementTeam
Key numbers — % complete, schedule slip, budget used, open critical issues, each with the change since the last report sent to the same audienceβœ“βœ“βœ“
Milestones — the late ones plus the next threeβœ“βœ“βœ“
Top risks (3) and Top issues (3 critical or high)βœ“
Open risks and Open critical & high issues — all of themβœ“
Overdue tasksβœ“βœ“
Budget — budget, cost and varianceβœ“
Over capacity (next 4 weeks)βœ“βœ“
Completed this period and Due next periodβœ“βœ“
Open tasks by owner and All open issuesβœ“

The Key numbers comparison reads from the report log (see What is logged below), so the first report you send to an audience has nothing to compare against and shows the plain figures.

How the health colour is suggested

The colour is worked out for you and the reasons are printed beside it. The rules:

ColourWhen
RedAny of: more than 15% of open tasks are overdue; a Critical issue has been open more than 7 days; cost is over budget; tasks are slipping more than 10 days on average against the baseline.
AmberAny of: more than 5% of open tasks are overdue; any Critical issue is open; more than 90% of budget is used; tasks are slipping more than 3 days on average; anyone is over capacity in the next 4 weeks.
GreenNone of the above.

You can override the colour when you send, but you must say why. The reason is printed in the report as Health set to Amber (suggested Green): your reason, so the reader can see it was a judgement call.

Printing

πŸ–¨ Print / Save as PDF prints the report only. The navigation, sidebar, buttons and the editor panel are removed automatically.

Sending a status report

Click βœ‰ Send status report on the Report page or the Dashboard, or use Ctrl+K → Send status report…. Nothing is ever sent automatically — the dialog prepares the message and you press Send in your email program.

The send dialog after changing the health colour from the suggestion. The send buttons stay greyed out until a reason is typed. (The live preview that sits above the footer is left out here.)
  • Audience, Period and Next period ends. The period defaults to the last 7 days up to today, and the next period ends 7 days from today. They set what “completed this period” and “due next period” mean.
  • Recipients. Everyone on the Team list who has an email address, pre-ticked according to their Reports setting. For the Team audience that means everyone who is not a stakeholder, plus anyone tagged Team. Untick anyone you do not want, and use Extra To and CC for other addresses. Invalid addresses are called out — Ignored invalid address(es) — rather than silently dropped.
  • Health. Shows the suggested colour with its reasons. Change it and a required box, Why you changed the colour, appears. Until you fill it in, the send buttons are disabled.
  • Executive summary starts from the wording you saved on the Report page for that audience, or from the automatic draft if there is none. Until you type in it, it follows changes to the period and colour; after that only ↻ Regenerate replaces your words. Decisions needed works the same way.
  • Preview. The formatted report is shown live below the fields, exactly as it will go out.

Getting it into Outlook

The footer has four actions. Which to use depends on your version of Outlook:

ButtonWhat it does
πŸ–¨ PrintOpens the report for printing or saving as a PDF.
β­³ Download email draft (.eml)Saves a ready-to-send draft with the recipients, subject and formatted report already filled in.
Copy formatted reportCopies the report, with its tables and colours, to the clipboard for pasting into any email.
βœ‰ Open emailOpens a new message in your default email program with the recipients and subject filled in and a placeholder for the body, ready for the pasted report.
πŸ“¨
Which route? Classic Outlook: download the .eml and open it — you get a ready-to-send formatted draft with recipients and subject. New Outlook or Outlook on the web: these may open an .eml as an attachment instead of a draft, so click Copy formatted report, then βœ‰ Open email for a new message with the recipients and subject, and paste the report in.

What is logged

Every send action — Download email draft, Copy formatted report or βœ‰ Open email — is written to the project's report log: the date, audience, recipients, colour, key numbers, summary and decisions. A copy that fails is not logged. The log does three jobs: it supplies the change since the last report figures in the next report for that audience, it drives the Last status report reminder on the Dashboard, and it is the record of what was actually said to whom. Sending also clears that audience's saved wording on the Report page.

βœ‰
The application still cannot send email. It hands a draft to your email program and logs that you did so. Nothing leaves your machine until you press Send there, so the log records intent, not delivery.

12Working with tasks

Creating one

Press N anywhere, click + Task in the top bar, use οΌ‹ Add task at the bottom of a board column to start it in that column, or double-click a calendar day to set the due date up front. The Add another button keeps the form open so you can enter a run of tasks quickly.

The task dialog

Click any card, table row or timeline bar to open it. Four tabs:

The Details tab. Changes save as you type β€” there is no Save button, and no way to lose an edit. The blue banner only appears on a task made from an issue, and the History list sits at the bottom.
TabContents
DetailsTitle, status, priority, owners, dates, progress slider, hours, budget and cost, tags, recurrence, and notes. At the bottom, the task's History (see below).
ChecklistSub-steps you can tick off and drag to reorder. Sync progress from checklist sets the task percentage from the proportion ticked.
FilesDrop files here or click to browse. They are embedded in the project and travel with a .pcc export.
DependenciesChoose predecessors this task waits on. Circular links are refused. The reverse list of tasks waiting on this one is shown below.

Task history

At the bottom of the Details tab, History (with a count chip) lists what has changed on the task: title, status, priority, owners, start, due and progress. Each entry says what it was and what it became, when, and what made the change — for example Due: Oct 5 → Oct 12 · Sep 30 2:14 PM (via merge of weekly.xlsx).

  • Newest first. Ten entries are shown; Show N older reveals the rest. The last 100 are kept for each task.
  • Recorded wherever the change came from — the task dialog, the table, a board drag, bulk edit, a spreadsheet import (via import of <file>), a merge (via merge of <file>) or a snapshot restore (via restore of snapshot).
  • New tasks start with a Created entry. Duplicated and recurring copies start with a fresh, empty history.
  • What it does not record. Undo does not add entries, and renaming a board column does not count as moving its tasks.
  • Where it is kept. In .pcc and .json files and in backups. It is not written to the Excel workbook.

A task created from an issue also carries a blue 🐞 From issue banner at the top of its dialog, showing the issue title and status. Click the title to open the issue.

Assigning several people

A task can be shared by any number of people. Type names into Owners separated by commas, or click one of the + Name buttons underneath to add someone from the team. Each assignee appears as a chip with their initials, a βœ‰ if you have their email or a ⚠ if you do not, and an βœ• to remove them.

  • Filtering by a person returns every task they are on, whether they are the only assignee or one of five.
  • Follow-up emails are addressed to everyone on the task who has an email on file, and the greeting names them all.
  • Cards, the timeline and the table show overlapping avatars, with a +2 badge when there are more than fit.
  • Names are matched case-insensitively and snapped to the spelling already used by your team, so typing matt joins Matt rather than creating a second person.
βš–
How shared work counts. On the workload charts a shared task counts as one task for each assignee, but its estimated hours are split evenly between them β€” a 30-hour task with three owners adds 10 hours to each person. That keeps capacity honest instead of triple-counting the effort.

Recurring tasks

Set a repeat rule β€” daily, weekly, monthly, quarterly or yearly, every n intervals, with an optional end date. When you move the task into a completion column, the next occurrence is generated automatically in the first column with dates rolled forward, a fresh unticked checklist, and hours and cost reset to zero. Past the end date, nothing more is created and a line is written to the activity log.

πŸ”
Ideal for PM cycles, inspections, and monthly reporting. The original completed task stays as the historical record.

Attachments

Files are stored inside the project as data, not as links to your disk, so moving the HTML file never breaks them. Size limits depend on your storage mode: 12 MB per file on IndexedDB, 700 KB in limited mode. Anything larger is refused with a message rather than silently dropped.

⚠
Attachments do not fit in a spreadsheet. CSV and Excel exports list attachment names on a manifest sheet but cannot carry the file contents. Use .pcc whenever the files matter.

13Drag and drop

Everything draggable uses the same engine, so mouse, trackpad, pen and finger all behave identically. Move about six pixels to start a drag; a shorter press is treated as a click.

Drag thisGrabResult
Card between columnsAnywhere on the cardChanges status. Moving into a completion column marks it done, stamps the completion time, and triggers any recurrence.
Card within a columnAnywhere on the cardReorders the column.
Several cards at onceCtrl-click first, then drag oneEvery selected card moves to the destination column.
Table rowThe β Ώ handleReorders tasks and switches sorting back to manual order.
MilestoneThe β Ώ handleReorders the dashboard milestone list.
Checklist itemThe β Ώ handleReorders steps inside a task.
File from your desktopDrop on the Files tabAttaches it to that task.
Project fileDrop anywhere on the windowStarts an import, with a preview first.
Visual feedback
The original fades to grey, a tilted copy follows your pointer, other cards shuffle aside to show where it will land, and the destination column is outlined in blue.
Changed your mind?
Drop outside any valid target and nothing happens. Already dropped? Ctrl+Z puts it back.
πŸ‘†
On a tablet the board scrolls sideways with a swipe, and dragging a card auto-scrolls the board when you approach either edge.

14Team and email follow-ups

Recording people

Open Project settings → Team to add each person with a role, an email address, and a weekly capacity in hours. The capacity drives the red overload colouring on the workload charts; the email address unlocks the follow-up buttons.

Addresses are validated as you type. The βœ‰ button emails that person all of their open tasks in one message.

Reports level and stakeholders

Two more settings on each person decide who receives status reports:

  • Reports is a dropdown — — none —, Executive, Management or Team. It is the audience this person belongs to, and it pre-ticks them as a recipient when you send that level of report.
  • Stakeholder (gets reports, no tasks or capacity) is for people who need to be kept informed but do no project work. A stakeholder still receives status reports, but is left out of the workload and capacity figures, the owner suggestions, and the sidebar Owner filter.

Sending a follow-up

Three ways in, all producing a draft in your normal email program:

  • One task β€” βœ‰ Email follow-up at the bottom of the task dialog.
  • Several tasks β€” tick rows in the Tasks table, then βœ‰ Email.
  • Everything overdue β€” βœ‰ Follow up on the dashboard's Overdue panel.
You review the whole message before anything opens, and you send it yourself.
πŸ”’
The application cannot send email. It has no network access whatsoever. Open in email hands a pre-filled draft to Outlook or whichever client is set as your default, and nothing leaves your machine until you press Send there. Copy text is available if no mail client is configured.

A note on length. Email links have a practical size limit on Windows. Very long messages β€” typically a bulk follow-up with long notes β€” are trimmed with a visible [...truncated] marker rather than silently cut. If that happens, attach an Excel export instead.

15Projects

You can keep as many projects as you like in one file. Switch with the dropdown in the top bar, the sidebar list, or Ctrl+K and type the project name.

Starting a new one

οΌ‹ New in the sidebar. Name it and pick a starting point:

TemplateWhat you get
Blank projectSix standard columns, nothing else.
General deliveryKickoff β†’ requirements β†’ design β†’ build β†’ test β†’ go-live, linked in sequence, with three milestones.
EAM / maintenance programEleven tasks covering asset hierarchy, master data load, criticality ranking, PM library, storeroom BOM, telematics integration, mobile rollout, KPI dashboard and cutover β€” plus four milestones, four pre-written risks, and a four-person team. Columns are renamed to maintenance language (Scheduled, Waiting on Parts/Info, Verification).
Capital / constructionApproval, permitting, procurement, mobilisation, construction, commissioning, closeout.
Software sprintA two-week iteration scaffold.
βž•
Creating a project never disturbs the ones you already have. The new project simply becomes the active one.

Duplicate, archive, delete

All three live in Project settings.

  • Duplicate makes a complete independent copy. Task identifiers are regenerated and dependencies are re-pointed inside the copy, so editing one never affects the other. Useful for turning a finished job into a template.
  • Archive keeps a project in the list, marked and greyed, out of your way but still searchable.
  • Delete project removes it entirely β€” after a confirmation, and after a recovery snapshot has been written.

Columns

Rename columns, reorder them, set a WIP limit, pick a colour with the swatch at the start of each row (it colours that column's bars on the Timeline and its header on the Board, and travels in the Excel Columns sheet), and choose which one counts as done. That flag is what drives completion percentages, strikethrough, overdue exclusion, and recurrence. Deleting a column that still holds tasks asks first and moves them to the first column.

Clear project

πŸ—‘ Clear project empties tasks, milestones and risks while keeping the project, its columns and its team. It asks for confirmation, writes a recovery snapshot first, and is undoable with Ctrl+Z.

16How saving works

There is no Save button, because you never need one. Every change is written to the browser's own storage on this PC about half a second after you stop typing.

Saved just now
Everything is written
Saving…
A write is in flight
Save failed
Storage is full or blocked
The save indicator in the top bar, in its three states.

When you reopen the file, the app restores the exact project you were in, the view you were on, your timeline zoom level, your theme and your filters. Closing the tab mid-edit is safe β€” a final save is forced as the page unloads.

What is stored, and where

On this computer only
Your browser profile's private storage, tied to this file. Nothing is transmitted anywhere. There is no account and no sync.
Which also means
A different browser, a different Windows user, or an incognito window will not see your projects. Clearing "cookies and site data" can erase them.
⚠
Browser storage is not a backup. It is fast and automatic, but it is one profile on one machine. Export a real file regularly β€” that is the copy you can email, archive, or restore onto another PC. The app shows a reminder banner if seven days pass without an export.

Auto-backup folder

Browser storage is one copy on one machine. To get a second copy without remembering to export, point the app at a folder — ideally one that syncs, such as OneDrive — and it will back up to it for you. This needs Edge or Chrome; in any other browser the button is greyed out, with the tooltip Needs Edge or Chrome.

  1. Open the setup. Click πŸ’Ύ Auto-backup… in the sidebar's Data section, or use Ctrl+K → Auto-backup folder….
  2. Choose folder… and pick the folder. The browser asks you to allow access to it.
  3. Carry on working. About five seconds after a change, the app writes two files into the folder. You do not need to do anything else.
FileWhat it is
PCC_Backup_latest.pccThe whole workspace, attachments included, overwritten each time.
PCC_Backup_YYYY-MM-DD.pccOne dated copy per day. The newest 14 daily files are kept and older ones removed. Other files in the folder are never touched.
Backed up 10:42
Last backup succeeded
Backup paused β€” click to resume
Browser needs one click
Backup failed β€” reason
The next change retries
The backup pill, which appears beside the save indicator once a folder has been chosen. Click it to open the setup dialog, or to resume when paused. Enter and Space work too.
  • After the browser restarts the pill says Backup paused — click to resume. Browsers require one click before a page may write to a folder again; click the pill and backups carry on.
  • Restoring. Backups are ordinary .pcc files, so drag one onto the window as you would any import. They are not password-protected.
  • The reminder banner (you have never exported a backup) stays quiet while an auto-backup has succeeded within the last 7 days. The sidebar also shows Last auto-backup: with the time.
  • Turning it off. Open the same dialog and choose Turn off. You can also switch to a different folder there.
☁
A backup folder inside OneDrive keeps the latest copy plus 14 days of daily copies, with nothing to remember.

Undo

Ctrl+Z steps back through the last sixty changes, Ctrl+Y steps forward. This covers everything β€” edits, drags, deletes, bulk operations, imports, clears and snapshot restores. Hovering the undo arrow tells you what will be undone.

17Export and import

Project Command Center open in Chrome / Edge Browser storage automatic Β· this PC only saves ~0.5s after a change load autosave .pcc project file everything + attachments .xlsx full project 7 sheets Β· no attachments .xlsx / .csv task list reporting only .pccx encrypted AES-256, password only export drag back in to restore Nothing crosses a network at any point. Files go where you choose to save them.
Autosave keeps you working; exports are the copies you can move, share and archive.

Choosing a format

Press Ctrl+S or click β­³ Export project. The dialog explains each option as you select it.

FormatCarriesRestores?Use it for
.pcc project fileAll projects if you choose, every task field, checklists, dependencies, milestones, risks, issues, team, activity log, task history, and attachment filesYes, fullyYour real backup. Archiving. Moving to another PC.
.xlsx full projectOne project across seven sheets β€” Project, Tasks, Columns, Milestones, Risks, Issues, Team. Attachments listed by name only.YesBackup you can also read and edit in Excel. Sharing with people who do not use the app.
.xlsx task listOne Tasks sheetTasks onlyReporting, pivot tables, Copilot analysis.
.csvOne flat task table, with a marker so Excel opens it in the right encodingTasks onlyFeeding another system.
.jsonIdentical to .pccYes, fullyOther tools or scripts that expect a .json extension.
.pccx encryptedSame as .pcc, encrypted with AES-256Yes, with the passwordAnything commercially sensitive leaving the building.
πŸ”‘
Encrypted exports cannot be recovered without the password. The key is derived from your password with 250,000 rounds of PBKDF2 and never stored anywhere. If the password is lost, the file is gone. There is no back door and no reset.

Importing

Drag any supported file onto the window β€” or use β­± Import file. A large drop zone appears while you are dragging.

File dropped anywhere on window Checked first readable? valid? damaged β†’ rejected .pcc / .json / .pccx encrypted? asks for password .xlsx written by this app recognised automatically any other sheet / CSV you map the columns Preview of changes οΌ‹ new ✎ changed βˆ’ removed Merge Β· Replace Β· Cancel A snapshot is taken before anything is changed.
No import touches your data until you have seen what will change and chosen an option.

Merge or Replace?

ChoiceWhat it doesPick it when
MergeAdds tasks that are new, updates ones that match by identifier or by title, and leaves everything else alone. Existing risks and issues are updated too (matched by ID, then by title), not just added; milestones and team members are added if not already present. Nothing is deleted.A colleague sent updates, or you edited a subset in Excel.
ReplaceOverwrites the matching project completely. Anything not in the incoming file is gone.Restoring a backup, or the incoming file is definitively correct.
CancelNothing changes.The preview is not what you expected.

Both are a single undo step, and both write a recovery snapshot beforehand. If the file contains a project you do not already have, it is simply added and the button reads Add projects.

What the preview shows

Besides the task counts, the merge preview now has Issues and Risks blocks. Each shows how many are new, changed and identical, with a list of the changed items and which fields differ, so you can see exactly what a colleague's file would alter before you choose.

What Merge and Replace protect

  • Merge never overwrites a task's history or its baseline. A blank value coming from Excel does not cut the link between an issue and its fix task. Stakeholder flags are kept when the incoming file has no Stakeholder column.
  • Replace from an Excel workbook keeps what a workbook cannot hold: the baseline, the report log, your saved report wording, task history and issue↔task links.

Importing someone else's spreadsheet

The column-mapping import treats an existing task gently:

  • Only the columns in the file change. When a row updates an existing task, blank cells are skipped, so an empty cell never wipes out a value you already have.
  • 100% means Done. A row with Progress 100 and no Status moves the task to the done column — unless it is already in a done column. If the row does give a Status, that always wins.

Damaged files

Every import is validated before it is allowed anywhere near your data. Truncated files, invalid JSON, missing project arrays and wrong-typed fields are all refused with an explanation, and the dialog states plainly that nothing in your workspace was changed.

Linked file refresh

If a colleague keeps a master file in a shared folder, πŸ”— Linked file… remembers it so you can pull updates with a button instead of hunting for it. Chrome and Edge ask permission the first time, and may re-ask after a restart.

πŸ”—
This needs the roomier storage mode. In limited mode the button explains the alternative, which gives an identical result: drag the updated file onto the window whenever it changes.

18The Excel workbook in detail

The full-project workbook is a real backup you can also open, read and edit. Export it, change it in Excel, drop it back on the window, and the project is rebuilt from what you typed.

What is on each sheet

SheetColumnsSafe to edit?
ProjectName, code, description, owner, status, start and target finish, currency, hours per day, colour β€” plus a marker, schema version and export timestamp.Yes, except the marker row
TasksTask ID, Title, Status, Priority, Owner, Owner Email, Start, Due, Progress %, Estimate h, Actual h, Budget, Cost, Tags, Depends On (IDs), Depends On (titles), Checklist, Recurrence, Notes, plus the read-only Baseline Start and Baseline Due.
The two Baseline columns are shown for reference and ignored on import. Owner takes several names separated by commas; Owner Email takes their addresses in the same order, separated by semicolons.
Yes β€” see rules below
ColumnsColumn ID, Name, Is Done Column, WIP LimitYes
MilestonesMilestone, Date, Achieved, NotesYes
RisksRisk, Probability, Impact, Score, Owner, Status, MitigationYes (Score is recalculated)
IssuesIssue ID, Issue, Status, Severity, System, Reported By, Assigned To, Logged, Resolved, Ticket #, Details, Resolution, plus the read-only Linked Task.
Leave Issue ID blank on new rows. Status and Severity have dropdowns.
Yes (Linked Task is for reading only)
TeamName, Role, Email, Weekly Capacity (h), Audience (Executive, Management or Team) and Stakeholder (Yes or No)Yes
AttachmentsTask, File name, Type, Size β€” a manifest only, present when attachments existInformational

Starting a project in Excel

If you would rather plan in a spreadsheet β€” or have Copilot build the plan from your notes β€” start with the blank template rather than a bare sheet. Get it from οΌ‹ New project → β­³ Blank Excel template, from the export dialog, or from the command palette.

What is in the template
Every data sheet ready to fill — including Issues and the Team audience columns — the six default board columns already listed, dropdown pickers for Status, Priority and Yes/No fields, two clearly-marked EXAMPLE rows, and an Instructions sheet documenting every column.
The EXAMPLE rows are safe
Any row whose title begins with EXAMPLE β€” is skipped on import. Delete them or leave them; they will never turn into real tasks, milestones, risks or people.
  1. Download the template and open it in Excel.
  2. Set the project Name on the Project sheet. Leave Project ID blank β€” that is what makes it import as a brand-new project.
  3. Fill in the Tasks sheet, one row per task, leaving Task ID empty on every row.
  4. Drop the file onto the app. The preview will say new project; choose Add projects.

Letting Copilot fill it in from your notes

The Instructions sheet ends with two ready-made prompts, so you do not have to explain the format yourself. Open the template in Excel, start Copilot, and paste the relevant one followed by your notes.

Instructions sheet β€” prompt for a new plan

You are filling in a project plan workbook. Work only on the Tasks sheet.
Create one row per task from my notes. Follow these rules exactly:
- Leave the Task ID column EMPTY for every new task.
- Status must be one of the names listed on the Columns sheet.
- Priority must be exactly Critical, High, Medium or Low.
- Write all dates as YYYY-MM-DD.
- Estimate h, Actual h, Budget and Cost must be plain numbers, no symbols.
- Separate tags with semicolons. Separate checklist items with | and tick
  them with [x].
- Do not add, rename, remove or reorder any column or sheet.
- Delete the rows that begin with EXAMPLE.
Then, if my notes mention people, add them to the Team sheet with their email.
My notes follow:
Both prompts ship inside the template, so the rules travel with the file.

The second prompt is for the other direction β€” you have a live project, you took notes in a meeting, and you want Copilot to apply them. Export the project as a full Excel workbook first, then use the update prompt on that file. Its critical instruction is that Task ID must never be altered on an existing row, because that column is what reconnects each edit to the right task.

You want to…Start fromImport as
Plan something newBlank Excel templateAdd projects
Apply meeting notes to a live projectExport → Excel workbook, full projectMerge
Replace a plan wholesaleExport → Excel workbook, full projectReplace
Pull in someone else's task listTheir own spreadsheetColumn mapping
πŸ”
The loop in one line. Notes β†’ Copilot fills the workbook β†’ drop it on the app β†’ Merge. Then export again next week and repeat. Task IDs keep everything matched up, so nothing duplicates.

Rules for editing in Excel

  1. Keep the sheet names and the header row. The importer finds everything by name, so Tasks must stay Tasks and its first row must stay as exported.
  2. Leave Task ID alone on existing rows. That is how an edited row is matched back to the right task, preserving its history, attachments and links.
  3. Leave Task ID empty on new rows. A proper identifier is generated on import.
  4. Delete a row to delete the task β€” but only on Replace. On Merge, absent rows are left untouched rather than removed.
  5. Type column names, not codes, in Status. Write In Progress or Complete exactly as they appear on the Columns sheet. An unrecognised value lands the task in the first column.
  6. Dates may be typed as text (2026-09-30) or as real Excel dates; both are understood.
  7. Multi-value fields use separators: tags and dependencies with semicolons, checklist items with a pipe, ticked ones prefixed [x]. To put a pipe inside an item, type \|; exports do this for you, so items containing a | survive the round trip.
  8. Dependencies can be written as titles. If Depends On (IDs) is empty, the Depends On (titles) column is read instead β€” type the exact task titles, separated by semicolons. That is what makes dependencies workable when you are planning from a blank template and no IDs exist yet.
  9. Leave the read-only columns alone. Baseline Start and Baseline Due on the Tasks sheet and Linked Task on the Issues sheet are there so you can read them in Excel. Whatever you type in them is ignored on import. As with tasks, leave Issue ID empty on new issue rows.
βœ…
Adding a person via a spreadsheet. Fill in Owner and Owner Email on the Tasks sheet, or add a row to the Team sheet. Either way that person joins the roster and can be emailed a follow-up straight away.

Importing a spreadsheet from somewhere else

A workbook the app did not write β€” a vendor's export, a maintenance report, a colleague's tracker β€” goes through a mapping step instead. Column headings are matched automatically where recognisable, and you correct anything wrong before importing.

Headings like Work Order, Assigned To and Target Date are recognised without help.

Choose whether existing tasks are updated, skipped, or added anyway. Re-importing the same sheet twice with Update will not create duplicates.

19Recovery snapshots

The app photographs your whole workspace automatically as you work, and always immediately before anything destructive: clearing a project, deleting a project, importing, replacing, or restoring another snapshot.

Each entry states when it was taken, why, and what it holds. β­³ saves it out as a normal project file.
  • Restore replaces your current workspace with that snapshot β€” after confirming, and after taking a snapshot of the present state, so even the restore is reversible.
  • Up to twelve event-driven snapshots and ten automatic ones are kept, oldest pruned first.
  • In limited storage mode only a few are kept, and attachment contents are stripped to save room. This is stated in the dialog.
⚠
Snapshots live in the same browser storage as your projects. They protect you from mistakes, not from a wiped browser profile or a failed disk. Only an exported file does that.

20Search, filters and shortcuts

Search

Press / and type. It matches task titles, notes, owners, tags and checklist text, and narrows every view at once β€” board, table, calendar and timeline. Esc clears it.

Filters

Four filters stack together in the sidebar: Owner, Priority, Tag, and a Flag filter for the useful slices:

  • Open only / Completed only
  • Overdue β€” past due and not done
  • Due in 7 days
  • Unassigned β€” nobody owns it
  • Dependency conflict β€” starts before a predecessor ends
  • On critical path

Whenever anything is filtered, a blue bar names every active filter and offers Clear filters, so a forgotten filter can never quietly hide your work. Filters that no longer apply β€” an owner who has left the project, for instance β€” are dropped automatically.

What each view does with a filter

ViewBehaviour
Dashboard and AnalyticsEvery task-derived figure recalculates for the filtered set β€” completion, open tasks, overdue, progress by column, the doughnut, workload. The header shows showing 14 of 32 tasks so the numbers are never ambiguous. Panels that are not task-based (milestones, risks, activity, critical path) stay project-wide and are labelled whole project.
Board, Tasks, Calendar, TimelineShow only matching tasks.
Risks and IssuesUnaffected β€” risks and issues are not tasks.
Status reportAlways covers the whole project, deliberately, so a circulated document can never silently omit work. If a filter is on, the report says so and offers to clear it.
πŸ‘€
Setting Owner turns the dashboard into that person's status page β€” their completion, their overdue items, their upcoming work β€” which is the quickest way to prepare for a one-to-one.

Command palette

Ctrl+K opens a search box over everything. Type a few letters to reach any command, any view, any project, or any task by name. Arrow keys move, Enter runs.

export|
Export project…Ctrl+S
Export full project as Excel workbookData
Export task list as ExcelData
Export tasks as CSVData
The palette is the fastest route to anything you cannot immediately see.

Newer palette entries worth knowing: New issue (Create), Issues (Go, 9), Set baseline, Auto-backup folder… (Data) and Send status report… (Email). The old Executive report entry is now called Status report.

Keyboard shortcuts

KeyAction
Ctrl+KCommand palette
/Focus search
NNew task
1 – 9Switch view (9 is Issues)
Ctrl+ZUndo
Ctrl+YRedo
KeyAction
Ctrl+SExport project file
Ctrl+PProject switcher
Ctrl+Shift+LCycle theme
EscClose dialog
?Help
Ctrl+clickAdd card to selection

Shortcuts are ignored while you are typing in a field, so N in a task title types the letter N.

21Themes and devices

Three themes, cycled with the ◐ button or Ctrl+Shift+L. Your choice is remembered.

Build PM task library
HighSep 12
Dark β€” the default.
Build PM task library
HighSep 12
Light β€” better in bright rooms and for projecting.
Build PM task library
HighSep 12
High contrast β€” heavier borders, maximum legibility.

Phones and tablets

Below about 900 pixels the sidebar becomes a drawer behind the ☰ button, panels stack into one column, and the board scrolls sideways one column at a time. Every drag works with a finger. The + Task button stays visible at all sizes.

Accessibility

  • Keyboard reachable throughout, with a visible focus ring on the active control.
  • Cards are focusable and open with Enter.
  • Status is never carried by colour alone β€” overdue items also show a ⚠ and a red date, and completed tasks are struck through.
  • Dialogs are marked up as dialogs for screen readers and close with Esc.
  • The high-contrast theme thickens every border and removes shadows and tinted backgrounds.

22Using Copilot and other AI tools

πŸ€–
Copilot cannot reach inside this application. Two reasons: your projects live in browser storage rather than in a document Copilot can open, and the Edge Copilot sidebar generally will not read a page loaded from a local file path. This is a limitation of how local files work, not something a setting will change.

What works well is to hand Copilot an export. Everything it needs is one click away.

What you wantHow to get there
Analyse the plan
trends, groupings, pivot tables, "what is slipping"
Export Excel β€” full project or task list, open it in Excel, and use Copilot in Excel on the Tasks sheet. Owners, emails, dates, hours, costs and tags are all present as real columns.
Write a status updateOpen the Report view, select all, copy, and paste into a Copilot chat or Word with an instruction such as "turn this into a short update for the steering group".
Polish a follow-up emailUse βœ‰ Email follow-up to open the draft in Outlook, then use Copilot in Outlook to rewrite the tone before sending.
Bulk-create tasks from a documentAsk Copilot to produce a table with the headings Title, Owner, Owner Email, Due, Priority, Estimate h. Save it as .xlsx or .csv and drop it on the window β€” the columns will be recognised automatically.
↩
The round trip works. Let Copilot restructure dates or re-assign owners in the exported workbook, then drop the file back on the app and choose Merge. Keep the sheet names, header row and Task ID column intact and everything reconnects.

23Troubleshooting

SymptomCause and fix
Most of my tasks vanishedA filter or search is active. Look for the blue bar at the top of the view and press Clear filters. If the bar is not there, check you are on the right project.
My projects are gone after reopeningAlmost always a different context: another browser, another Windows account, an incognito window, or a cleared "cookies and site data". Import your most recent export. Check ? → About to confirm storage is working.
"Save failed" in the top barStorage is full or blocked. In limited mode the ceiling is about 5 MB β€” usually large attachments. Export a backup immediately, then delete big attachments or move them to a shared drive and link them in the notes.
A task will not go to DoneNo column is marked as the completion column. Open Project settings → Columns and tick DONE on the right one.
Nothing shows on the timelineOnly tasks with a start or due date appear. Add dates in the table view.
A dependency was refusedIt would have created a loop β€” A waits on B while B waits on A. Remove the opposing link first.
Red arrows on the timelineNot an error: the successor starts before its predecessor finishes. Either move the dates or accept the overlap.
The email button did nothingNo default mail application is set in Windows, or the address is missing. Use Copy text in the compose dialog and paste into webmail.
The top bar says “Backup paused”The browser needs one click before it lets the page write to your backup folder again, usually after a restart. Click the pill and backups resume. See Auto-backup folder in section 16.
The Auto-backup button is greyed outYour browser cannot write to folders. Open the file in Edge or Chrome, or use Export project instead.
The .eml opens as an attachment, not a draftNew Outlook and Outlook on the web may do this. Use Copy formatted report, then βœ‰ Open email, and paste the report into the new message. Classic Outlook opens the .eml as a ready-to-send draft. See section 11.
The health colour looks wrongThe reasons behind the suggestion are listed next to it in the report and in the send dialog. If you disagree, change the colour — you will be asked for a reason, which is printed on the report.
Excel import asked me to map columnsThat workbook was not written by this app, so it is treated as a plain task list. Only a full-project export from here restores everything automatically.
The re-imported workbook duplicated tasksThe Task ID column was cleared or renamed. Re-export, edit again, and leave that column untouched.
The table feels slowYou have chosen Show all on a very large project. Press Back to 250 at a time.
The file will not openRight-click → Open with → Chrome or Edge. If your organisation blocks local HTML, ask for the file to be placed on an approved internal share.
Lost the password on a .pccxThe file cannot be opened. Encryption is genuine and there is no recovery. Use your unencrypted backup.

Frequently asked

Can two people use it at once? Not on the same data simultaneously β€” there is no server to coordinate with. Pass a .pcc or the Excel workbook back and forth and use Merge, which is designed exactly for this.

Is anything sent anywhere? No. The file makes no network requests of any kind. You can confirm it by disconnecting entirely and using it as normal.

Will my files still open in a future version? Yes. Every export records a schema version and newer builds migrate older files on load.

How many tasks can it handle? Tested at 1,200 tasks in one project: dashboard, board and timeline all render in well under a second, and the critical-path calculation takes about three milliseconds. The table caps its rendering to stay responsive.

Can I put it on a shared drive? Yes, but be aware each person's data stays in their browser. The shared drive distributes the app, not the projects β€” exchange those as files.

24Data safety checklist

Ten seconds a week keeps you out of trouble.

Every week

  • Press Ctrl+S and save a .pcc file somewhere backed up.
  • Give it a dated name β€” the app suggests one automatically.
  • Dismiss the reminder banner only when you have actually exported.
  • Turn on Auto-backup to a OneDrive folder, which keeps 14 days of daily copies without you having to remember.

Before anything drastic

  • Clearing, deleting or replacing already writes a snapshot β€” but export first anyway if the work is significant.
  • Read the import preview before choosing Merge or Replace.

Never rely on

  • Browser storage as your only copy.
  • Snapshots surviving a wiped browser profile.
  • Excel exports to carry attachment files.
  • Remembering a .pccx password you did not record.

Moving to a new PC

  • Copy the HTML file across.
  • Export All projects as .pcc on the old machine.
  • Open the app on the new one and drag that file in.
🎯
The one-sentence version. Work freely β€” it saves itself and sixty undos have your back β€” but export a .pcc once a week, because that is the only copy that survives a browser reset.

Project Command Center v1.0.0 · schema v3 · guide revision 2.
The interface examples in this document are rendered with the application's own stylesheet, so they match what you see on screen and stay sharp at any zoom or in print. Print this guide with Ctrl+P.